Decking plate_SupplyPro Co., Ltd._Beijing Baosin Shidat Environmental Protection Materials Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Beijing Baosin Shidat Environmental Protection M

A comprehensive large-scale manufacturer of innovative building panels, integ...

15210409621
 

Product Categories
Home > SupplyPro Co., Ltd. > Decking plate
Decking plate
品牌: Baoshin Worldstar
Model: Place an order
Specs: Inquire
Quantity: Place an order
单价: 电议
最小起订Quantity:
供货总Quantity:
有效期至: 长期有效
最后更新: 2023-06-16 10:29
 
详细Info

Roof Decking Product Introduction

Baoxin floor deck serves as a formwork during construction, bearing the construction loads and the weight of concrete. In use, it acts as the bottom reinforcement. After the concrete reaches its strength, a composite effect is produced.

Baosin - Closed Combination Floor Features:

Robust concrete shear bond: The special closed rib design offers excellent longitudinal shear performance. Under its allowable design load, the closed deck slab has never experienced any slippage between the steel deck and concrete.

· Fire-resistant performance: The ribbed boards are fully encased in concrete, similar to the rebar within cast-in-place concrete slabs. Closed rib floor decks can completely replace the tensile reinforcement of the floor slab under positive bending moments, and achieve a fire resistance of 1.5 hours without the need for fire-resistant coatings.

· Composite floor section: Closed composite floors offer greater effective floor height, providing enhanced resistance to positive bending moments during the usage phase.

· Ceiling and suspended ceiling track system: Suitable for installation of ceilings, suspended ceilings, electrical and water pipes, etc., without the need for drilling or welding. It can be moved, removed, or reinstalled as needed during the building's use.

Easier and quicker construction: No need for any end caps, no leakage, which can shorten the construction period.

Flat deck bottom appearance: The floor bottom is smooth, providing a more aesthetic look for buildings that do not desire suspended ceilings.

· Effectively reduces floor height: With fireproof and vibration resistance standards met, the total thickness of the closed floor deck is only 110-130mm, reducing weight, lowering costs, and increasing net height

Cost-effective: The steel bars at the bottom of the closed-web deck, which bear the positive bending moment, are replaced by closed-web shaped steel plates, eliminating the need for fire-retardant paint, reducing steel consumption, and lowering costs.

Baoxin Color Steel - Offering over a dozen floor deck models for your selection! There's always a size that fits your needs!

 

  




Baoxin - Closed Deck Composite Floor Hanger

Bore Size: Available in three options for M6, M9, and M12 screws or bolts.

Cautionary Notes:

When the concrete above the closed slab has been poured and the concrete has reached 75% of its design strength, the slot-type suspended system may be installed and utilized for its hanging function. We offer suspended ceiling, electrical and water supply, air conditioning piping, and equipment hanging facilities.

  

 

Advantages:

Easy assembly and disassembly, no special construction equipment required.

Reusable with almost zero loss.

Offering high-density and high-strength suspension services.

No noise will be generated during construction.

Baosin - Composite Floor Construction Instructions

Construction Steps

Size re-inspection and line marking

1. Axial Dimensions: Recheck the steel beam installation axial dimensions to ensure they match the corrugated steel plate layout drawing.

2. Beam Top Surface Treatment: Ensure that all lifting rings on the steel beam top have been cut off and smoothed, and the rust, oil stains, and debris on the beam top surface should be thoroughly cleaned.

3. Location Lines: According to the roof deck layout, locate the starting line and middle control line on the beam top surface for the corrugated steel sheet. The starting line should indicate the laying direction and the hoisting bundle number of the steel sheet. The middle control line can also serve as the starting line for section-wise laying.

Part II: Hoisting and Laying

1. Baosin-Deformed Steel Sheet should be installed according to the approved layout plan. When bundled deformed steel sheets are stacked on structural elements, attention should be given to the design support strength of the structural members to avoid exceeding their allowable load.

2. Baosin - Steel deck sheets should be bundled and stacked, spanning multiple steel beams. When a single span is placed between two beams, attention should be given to the width of the ends' supports to prevent tipping and potential falling accidents.

3. After the Baosin steel deck is hoisted into place, start from the already popped-out starting line of the steel beam and sequentially position each panel along the laying direction. Once past the control line, adjust the panel seams as necessary.

4. Construction should be halted during strong winds. Any unfastened corrugated steel sheets should be immediately re-tied. Otherwise, the sheets may be blown away by strong winds, leading to safety accidents or damage to the corrugated steel sheets.

III. Fixed


1. Baosin Corrugated Steel Sheets should be immediately fixed to the structural members with electric welding after positioning.

2. Any corrugated steel sheet that has been laid but not secured may be blown away or slipped off, causing an accident.

 


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

15210409621