Pump Station Gate - Ruixin Hydraulic Machinery - Factory Direct Prices, Installation and Commissioning Included_SupplyPro Co., Ltd._Xinhe Ruixin Hydraulic Machinery Factory 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Xinhe Ruixin Hydraulic Machinery Factory

Gate operators, gates, winches, silt screens, cleaning machines, rubber water...

15803293787

Pump Station Gate - Ruixin Hydraulic Machinery - Factory Direct Prices, Installation and Commissioning Included

产品Price Negotiable

最小起订Quantity:1 Tai 供货总Quantity: 999 Tai

用手机扫描二维码直达商品手机版
MobileView details
Location:
Hebei/Xingtai
有效期至:
长期有效
最后更新:
2022-12-06 14:38
Product Details

1. Installation and Commissioning Method for Pump Station Gate

The installation accuracy of the embedded gate components is crucial for the gate to operate freely and effectively prevent water leakage. Moreover, adjustments cannot be made after the second-phase concrete pouring. Therefore, it is essential to strictly ensure that the installation accuracy meets the requirements of hydraulic specifications SLJ201-81 and PLJ201-80.

① Pre-construction preparation: a. Coordinate with civil construction to embed prefabricated iron in the reserved闸槽 of the concrete.

b. Prior to the installation of the gate embedment, all templates and debris in the reserved gate groove must be thoroughly cleared. C. Verify that the specifications and design requirements of the gate embedment are correct. D. Inspect the manufacturing quality of each component according to the manufacturing drawing for the embedment, and the allowable deviation should comply with the standard specifications. E. Correct any non-compliant gate embedments; those that cannot be corrected should be replaced. Non-compliant gate embedments must not be installed, as they cannot be adjusted after concrete pouring. F. Custom measuring tools. The gate embedment is the track for the gate's up and down movement, as well as the gate's water stop, requiring high precision. The embedment height is around 9 meters, and even a standard plumb bob is not sufficient. Therefore, custom templates and a 5kg plumb bob are necessary measures to ensure precision.

询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
15803293787

QQ Service

QQ Service:
2213720843

Back to Top