The training tower can be customized and produced according to customer requirements._News Center Co., Ltd._Hebei Saadian Metal Components Technology Co., Ltd.
欢迎来到Hebei Saadian Metal Components Technology Co., Ltd.!
  • Sales Hotline:13343189888  13343189888


Company Information

Location:Hebei/Hengshui

会员级别:采商通4

身份认证:    

我的勋章:  通过中商114认证

Business Card

  • 公司名称Hebei Saadian Metal Components Technology Co., Ltd.
  • 联 系 人周经理 (先生)
  • 公司电话13343189888
  • 手机号码13343189888
  • Company AddressHebei Province, Jing County, Longhua Industrial Area, Hengshui City

更多Product Classification Co., Ltd.
  • No Category
Home > News Center Co., Ltd. > The training tower can be customized and produced according to customer requirements.
News Center Co., Ltd.
The training tower can be customized and produced according to customer requirements.
Publish Time:2022-03-22        View Count:34        Return to List

The training tower can be custom-manufactured to meet customer requirements.

1. The training tower window dimensions are 1.2m x 1.8m, with a minimum distance of 0.65m from the tower edge. The window sill width is 0.35m, and the sill board thickness is 0.05m (protruding 5cm from the tower wall). Each floor's window sill is 0.8m above the floor level, with a floor height of 3.5m. An inner staircase with a minimum width of 0.9m should be installed, and the staircase handrail tube diameter must be no less than 0.026m. The height of the inner staircase handrail is 1.1m.

2. Platforms no less than 1.5 meters wide should be set up on the interior sides of each level of the training tower, with a railing at the top level.

3. The training tower is equipped with an outdoor fire ladder. The ladder should extend to the top of the tower, with a width of no less than 50 centimeters.

Training Tower Description:

1. The tower is primarily composed of (1) simulated windows, (2) floor partitions, (3) rear frames, (4) observation and command platform frames, and the main steel structural frame. Floor partitions (steel plates) are installed between the upper and lower adjacent simulated windows. 2. A rear frame corresponding to the simulated windows is located below the rear of the tower. 3. The simulated windows, floor partitions, rear frames, and main frame are bolted together. 4. Stairs connect each floor to the next. 5. The upper part of the tower is equipped with observation and command platforms. 6. The training tower generally undergoes anti-corrosion treatment with spray paint, in galvanized color. 7. The fire training tower equipment is also equipped with auxiliary facilities such as fire pulleys, poles, and simulated walls. No maintenance required for 20 years. 8. Grooves or protrusions for hand-climbing are set at the two corners of the training tower. 9. The training tower is fitted with downspouts, preferably using galvanized iron pipes and must be securely installed, with reinforcement every floor, and pipe size should be 0.08-0.1 meters. Metal pipes are installed on the outer wall at the top of the training tower for drying fire hoses (special pulleys for drying fire hoses are required, and the drying position must not interfere with the two sections of the ladder). 10. Metal rings, approximately 0.1-0.15 meters from the center of the window frame on the window side of the top of the training tower, are pre-buried for hanging pulleys (metal rings must be installed in 5 locations), with a size of 0.1-0.15 meters, and the lifting capacity should not be less than 3 tons. 11. The training platform in front of each training window on every floor of the training tower should be at least 2.4 meters wide. For more information on five-story fire training towers and chemical training towers, please contact Hebei Saadian Metal Structure Technology Co., Ltd.

 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13343189888