Municipal Drainage Inspection Manhole, Shanxi Hengda Xing_SupplyPro Co., Ltd._Shanxi Hengda Xing Prefabricated Components Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Shanxi Hengda Xing Prefabricated Components Co.,

Septic Tanks, Inspection Wells, Electrically Heated Wells

Tianzhu Hui Star Member
15392627775
 

Product Categories
  • No Category
Home > SupplyPro Co., Ltd. > Municipal Drainage Inspection Manhole, Shanxi Hengda Xing
Municipal Drainage Inspection Manhole, Shanxi Hengda Xing
品牌: Hengda Xing Prefabricated Components
Manufacturer: Hengda Xing Prefabricated Components
Is negotiation possible?: Negotiable
Sample Support: Negotiable
单价: 1.00/piece
最小起订Quantity: 1 piece
供货总Quantity: 99999 piece
有效期至: 长期有效
最后更新: 2023-05-25 13:57
 
详细Info

Our company specializes in: Shanxi Septic Tanks, Taiyuan Cement Septic Tanks, Shanxi Prefabricated Septic Tanks, Taiyuan Concrete Septic Tanks, Shanxi Inspection Chambers, Taiyuan Prefabricated Inspection Chambers, Shanxi Firewater Reservoirs, Taiyuan Cement Inspection Chambers, Shanxi Concrete Inspection Chambers, etc. Welcome to call for inquiries.

Our company is pleased to share the following content with you:

What are the construction methods for cement manholes?

Construction methods for pre-mixed well.

Load-bearing capacity over 100kg/m², with a 1000mm thick gravel layer laid underground.

The product's shape is available in circular and rectangular frames. The standard pipe interface is the bending rigidity sleeve. The pipe end features a soft socket for connecting to the drainage inspection well.

Connect concrete components, inspect if the pipeline is level. Connect the precast manhole's rain downpipe to the embedded component hole by adjusting the height of the connection to the main pipeline.

Considering different backfill thicknesses, the well house is composed of one well circle and seven adjustable blocks of varying heights. The diameter of the φ700 circular well is the same as that of the rectangular frame well.

Pre-manufactured inspection wells and pipe plugs should have burrs removed. During wiring, use 1:2 cement mortar water or PU mixed cement mortar. Water flow should be between 20%-50%, and wiring thickness should be 10-15mm. When selecting other pipes (such as plastic pipes), follow their specific pipe requirements.

If you need cement manholes, please call to contact us.

询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

15392627775