The Working Principle of Liao Ning Pipe Jacking_News Center Co., Ltd._The Working Principle of Liao Ning Pipe Jacking,Shenyang Wanshi Machinery Engineering Co., Ltd._Shenyang Wanshi Machinery Engineering Co., Ltd._Zhongshang 114 Industry Resources Network
Shenyang Wanshi Machinery Engineering Co., Ltd.

Specialized construction company for non-excavation projects such as horizontal directional drilling, mechanical jacking, mud balance, and shallow-buried tunneling.

Consultation Hotline
18804040408  18804040408
 

Company Information

Location:Liaoning/Shenyang

会员级别:标王3

身份认证:   

我的勋章:  通过中商114认证 [诚信档案]

Business Card

  • 公司名称Shenyang Wanshi Machinery Engineering Co., Ltd.
  • 联 系 人刘经理 (先生)
  • 公司电话18804040408
  • 手机号码18804040408
  • Company AddressShenyang District, Hunnan District, China (Liaoning Free Trade Zone) - 99-1 Quanyun 3rd Road (1612)
home > News Center Co., Ltd. > The Working Principle of Liao Ning Pipe Jacking
News Center Co., Ltd.
The Working Principle of Liao Ning Pipe Jacking
Publish Time:2023-07-04        View Count:23        Return to List

Jacking technology is a non-open-cut pipeline construction method used in municipal construction. Its advantages include minimal impact on the surrounding environment, small construction site, and low noise. Moreover, it can perform underground work at greater depths, which is an advantage that excavation and burial cannot match. However, there are also drawbacks to jacking technology, such as longer construction time and higher project costs. Below, the editor introduces the working principle of Liaoning's jacking technology.

The working principle of Liaoning pipe jacking:

The jacking construction method, which has developed following the shield construction method, is a type of underground pipeline construction that does not require excavation of the surface layer and can cross over highways, railways, rivers, ground buildings, underground structures, and various underground pipelines. The jacking construction relies on the thrust from the main jacking cylinder and intermediate chambers between the pipes, pushing the tool pipe or tunneling machine through the soil layer from the working well to be hoisted into the receiving well. At the same time, the pipeline follows the tool pipe or tunneling machine, buried between the two wells, to achieve the construction method of non-excavation pipeline laying underground.