Shandong equipment removal and recycling, chemical plant overall recycling, factory demolition_SupplyPro Co., Ltd._Suzhou Haoren Environmental Recycling Resources Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Suzhou Haoren Environmental Recycling Resources Co., Ltd.

Comprehensive demolition qualifications with over 10 certifications, includin...

Soule Star Diamond Member
Consultation Hotline
15250163365

News Center Co., Ltd.

Product Categories
  • No Category
Home > SupplyPro Co., Ltd. > Shandong equipment removal and recycling, chemical plant overall recycling, factory demolition
Shandong equipment removal and recycling, chemical plant overall recycling, factory demolition
品牌: Hao Ren
Product Specifications: Dismantle
Categories: 99
Service Content: Dismantle
单价: 99999.00/Piece
最小起订Quantity: 1 Piece
供货总Quantity: 1 Piece
有效期至: 长期有效
最后更新: 2025-10-22 13:56
 
详细Info

Chemical factories' outdated chemical equipment removal and recycling services are available on-site. We dismantle and recycle equipment that is aging, has outdated technical performance, high energy consumption, low efficiency, and poor economic benefits. For equipment that is severely damaged beyond repair due to wear, corrosion, accidents, or other disasters, or that severely pollutes the environment and endangers personal safety and health, or that is explicitly required to be phased out by national regulations, we provide recycling and dismantling services.

First-tier industrial factory demolition qualification, first-tier demolition project for chemical factories. Our company specializes in the dismantling of chemical factories, oil refineries, starch factories, distilleries, milk factories, monosodium glutamate factories, beverage factories, chicken essence factories, breweries, fertilizer factories, and wastewater treatment plants, etc. We offer dismantling projects for various factory buildings and the purchase of scrap equipment from bankrupt enterprises. With years of experience in the demolition industry, we have extensive dismantling expertise. Please call for more information!

Each critical step in the decommissioning process is confirmed by a designated person. Internal equipment such as process pipelines, towers, and containers are blow-scanned, cleaned, and replaced to remove all hazardous media. Any toxic or flammable substances remaining in equipment like tanks and kettles must be confirmed on-site. Specialized operators must be certified, and supervisors must be trained and certified.

During construction, a designated person must monitor the structural condition of the buildings being demolished. If there is a tendency towards instability, operations must be halted immediately, and effective measures must be taken to eliminate the hazard. All dismantled materials must be cleared promptly, categorized, and stacked in designated areas, without throwing them from heights. The removed materials and construction waste should also be cleared away promptly, and high-altitude throwing is strictly prohibited.

Prior to dismantling the factory, we first develop a management plan for the health and safety of the surrounding environment. We pre-seal the factory's outgoing pipeline network to prevent chemical contamination of the external environment. To ensure the land can be reused, we strictly adhere to standards and ensure no pollution is caused to the land and surrounding environment during the dismantling process. We have a comprehensive environmental safety management system that covers everything from training to operational management.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

15250163365