Anhui chemical factory decommissioning, chemical equipment contract removal, and factory demolition recycling_SupplyPro Co., Ltd._Suzhou Haoren Environmental Recycling Resources Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Suzhou Haoren Environmental Recycling Resources Co., Ltd.

Comprehensive demolition qualifications with over 10 certifications, includin...

Soule Star Diamond Member
Consultation Hotline
15250163365

News Center Co., Ltd.

Product Categories
  • No Category
Home > SupplyPro Co., Ltd. > Anhui chemical factory decommissioning, chemical equipment contract removal, and factory demolition recycling
Anhui chemical factory decommissioning, chemical equipment contract removal, and factory demolition recycling
品牌: Hao Ren Demolition Engineering Co., Ltd.
Building Demolition: Chemical factory decommissioning
Factory Demolition: Chemical Equipment Recycling
Structural Steel Demolition: Factory professional dismantling
单价: 9.00/Piece
最小起订Quantity: 1 Piece
供货总Quantity: 9 Piece
有效期至: 长期有效
最后更新: 2025-10-22 13:53
 
详细Info

High-pricedRemoveRecycled waste or obsolete chemical factory equipmentEquipmentAnd various types of reactorsOuter tube half-tube design, electrically heated stainless steel, steam-heated thermal oil circulating heating, multi-functional dispersing, electrically heated typeSpiral jacketed, external half-tube, internal coiled, drying finned tubeYZG Vacuum Dryer, Bi-conical Rotating Vacuum Dryer, Radiator, Hot Air Circulation Oven, Rotating Flash Dryer, Enamel Reactor Vessel, Stainless Steel Reactor Vessel, Glass Reactor Vessel, Enamel-lined Reactor VesselWait a minute.


Persons entering the construction site must wear hard hats. Any work performed at heightsMandatory seatbelt use. Implement substantial, effective, and safety-assuring protective measures. Promptly clean and segregate materials during disassembly, and stack them in designated areas. Keep construction site materials neatly arranged, maintain clear pathways and drainage pipes, ensure no standing water, and promptly remove construction waste.Assign a person to water the area regularly to maintain humidity.

The pressure of the blowing air source for process pipelines is generally controlled at:0.6~0.8 MPa. Adjust the pressure of the blowdown gas source as needed. Remove the instruments on the blowdown pipe to prevent damage to the instrument components. Additionally, take appropriate protective measures for the regulating valve; if necessary, remove it and install a temporary reducer. Prior to blowing, blind plates must be added to the inlets and outlets of heat exchangers, towers, and other equipment. Blowing can only proceed after the upstream blowdown is approved.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

15250163365