Hengshui Tongxiang Bridge Components Co., Ltd.VIP

管道封堵气囊,橡胶支座、支座配套钢板、盆式支座、球型支座、桥梁伸缩缝
Enter Shop

GPZ Series, JPZ Series Basin-Type Supports

平台认证
  • Unit Price

    Negotiable

  • Brand

    Hengshui Tongxiang

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



衡水通翔桥梁配件有限公司.

VIP   采商通第4年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Hengshui Tongxiang

  • Unit Price:

    Negotiable

  • MOQ:

  • Total:

    0piece

  • Address:

    HebeiHengshui

  • Delivery:

    3days

  • View More

Description

 

 

GPZ Series of Basin-Type Rubber Support and Specifications

Performance and Classification

a. Bi-directional activity support: Features vertical rotation and longitudinal and lateral sliding capabilities, code: SX.

b. Single-way activity support: Features vertical rotation and single-direction sliding capability, code DX.

c. Fixed Bracket: Only has vertical rotation capability, code GD.

Applicable Temperature Range

a. Standard Temperature Bracket: Suitable for -25℃ to +60℃

b. Cold-resistant Bracket: Suitable for temperatures ranging from -40℃ to +60℃, code F.

Technical specifications of GPZ

a. The vertical angle of the support does not measure less than 40 degrees.

b. Vertical bearing capacity (KN): 1000 to 50,000, divided into 28 grades; the uneven bearing capacity on a non-slip surface is 10% of the vertical capacity.

c. Friction Coefficient: Standard temperature type, μ≤0.04. Cold-resistant type, μ≤0.06.

d. Displacement values are shown in the table.

Product Code Representation Method

Installation of GPZ series basin-type rubber supports

Installation Preparation

1. It is recommended to set a support padstone under the pedestal base, and pre-drill bolt holes according to the spacing of the base plate bolts and the specifications of the base column. The surface of the support padstone should be level. During construction, pay attention to the elevation of the top of the support padstone to accommodate the thickness of the epoxy mortar layer under the support plate. The padstone outside the base plate should be shaped into a slope to prevent water accumulation.

Before the bracket installation, open the box and inspect all bracket components and the packing list. Do not dismantle the bracket at will before installation.

Installation Steps and Precautions

1. Mark the centerline at the design position of the support, and also indicate the centerline on the top and bottom plates of the support.

2. Insert the base bolts into the base (roof) bolt holes and screw them into the base column. Place a rubber grommet with a diameter slightly larger than the base column support diameter between the base and the base column.

3. After the support is positioned and leveled, pour epoxy mortar or high-grade mortar into the anchor bolts and the bedding layer under the support base using epoxy mortar or high-grade mortar. After the mortar hardens, remove the shims used to adjust the support level and fill the shim location with epoxy mortar. The epoxy mortar must be poured densely.

4. When using welded connections for the support, pre-buried steel plates are installed at the top and bottom plate positions of the support. After the support is in place,焊接 should be done in a symmetrical, intermittent manner. Be cautious to prevent excessive heat from affecting the rubber and polytetrafluoroethylene plates during welding. Rust-proof treatment should be applied to the welded areas after welding.

5. If using a basin-type support for the D-shaped beam, temporary support measures should be taken at the beam ends during construction and installation to prevent lateral tilt of the lower beam. Only after the cross plates between the two D-shaped beams are welded into a single unit can the temporary supports be removed.

6. Upon unboxing the activity bracket, ensure the protection of the PTFE board and stainless steel slider to prevent scratches and dirt from adhering to their surfaces. Also, check if the 5201-2 silicone grease is fully filled.

7. The center of the support should align or be parallel to the centerline of the main beam. When installing a unidirectional sliding support, the upper and lower guide blocks must remain parallel, with the crossover angle not exceeding 5 degrees.

8. When performing system conversion cutting for continuous beam bridges and similar structures, insulation measures must be taken to prevent damage to the rubber and polytetrafluoroethylene plates.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery HebeiHengshui3dayswithin
Brand Hengshui Tongxiang
Expiry Long Valid
Update 2022-04-08 10:31
Gallery

Hengshui Tongxiang Bridge Components Co., Ltd.Published byGPZ Series, JPZ Series Basin-Type SupportsGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top