Construction Process of Purification Engineering:
1. Communication, site visit
Before initiating a project, it is crucial to engage in comprehensive communication with the client and conduct on-site inspections to understand their needs, ensuring the development of a well-defined and reasonable plan.
2. Design
The engineering company has developed an initial design plan based on preliminary communications and on-site inspections, and has made adjustments according to the actual needs of the client.
3. Solution Discussion
A proposal often requires multiple communications to finalize the plan.
4. Sign the contract
Before the project begins construction, it's crucial to act in accordance with the contract to ensure both parties' rights and interests. The contract must specify the purification construction process and the project's cost, among other information.
5. Design construction drawings
After the contract is signed, the construction drawings will be issued, and the purification project will be carried out strictly according to this drawing.
6. Construction
This stage requires construction strictly according to the construction drawings.
7. Debugging and Testing
After completion of the project, the system must be adjusted according to the contract requirements and acceptance specifications, while also verifying if all processes meet the standards.
8. Inspection
If the inspection is error-free, the next step is to conduct the acceptance. The item can only be officially put into use after acceptance is completed.