Shandong Xinke Environmental Protection Technology Co., Ltd.VIP

是一家集科研开发、生产制造、技术服务于一体的企业。
Enter Shop

Full-bridge Sludge Scraper

平台认证
  • Unit Price

    Negotiable

  • Brand

    Xinke Environmental Protection

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



山东鑫科环保科技有限公司

VIP   采商通第1年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Xinke Environmental Protection

  • Unit Price:

    Negotiable

  • MOQ:

  • Total:

    0

  • Address:

    ShandongWeifang

  • Delivery:

    0Hours

  • View More

Description

Peripheral drive mud scraper is a scraper with the drive system located at the edge of the sedimentation pond, usually arranged symmetrically. Therefore, a drive system including an electric motor, reducer, gear set, drive shaft, bearings, and wheels, etc., needs to be set up on both sides of the pond. Types include: full-bridge, half-bridge.




(1) Full-bridge




Composition Structure:




Primarily composed of components such as the working bridge, central support, scraper girder, drive unit, flow stabilizer tube, skimmer plate, float slag bucket, mud scraper, and collecting device.




Application Scope:




This equipment is suitable for primary and secondary sedimentation tanks in large sewage treatment plants (typically with flow rates exceeding 600 cubic meters per hour and tank diameters greater than 20 meters). It scrapes and collects sludge from the bottom of the tanks, usually equipped with a float渣 scraper system at the top, central inflow, and peripheral outflow, with mud being discharged centrally.




Operating Principle:




Under the power of the drive unit, the scraper truss and mud scraper assembly rotate slowly around the central support, scraping sludge settled at the bottom of the pool towards the central mud collection pit. The sludge in the mud hopper is discharged out of the pool through the pressure difference of water level within the pool. Meanwhile, the skimming plate diverts floating debris into the skimming hopper, which is then automatically flushed out of the pool or drained out naturally.




(B) Half-bridge




Structure:




The complete unit is mainly composed of bridge frames, driving devices, vertical shafts, underwater bearings, double scraper arms, and mud scrapers.




Working Principle:




Wastewater from the sedimentation pond flows into the conduit under the working bridge, then spreads evenly around the pond due to the uniform distribution of the umbrella-shaped cover of the conduit. Sludge settles at the bottom of the pond by gravity. The scraper rotates slowly under the drive of the scraper arm, and the clarified liquid separated from it is discharged out of the pond through the overflow weir plate. The sediment is scraped along the pond perimeter by the scraper and directed into the central mud pit at the center, from where it is discharged to outside the pond via the mud discharge pipe under the action of hydrostatic pressure.




Product Features:




Utilizes a hinged structure for excellent load-bearing performance




2: Equipped with a protective device, good performance




3: Equipped with a shaft-mounted reducer, compact in structure


Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery ShandongWeifang
Brand Xinke Environmental Protection
Brand Xinke Environmental Protection
Quality Reliable and durable
Service Efficient Response
Expiry Long Valid
Update 2025-10-29 10:35
Gallery

Shandong Xinke Environmental Protection Technology Co., Ltd.Published byFull-bridge Sludge ScraperGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top