License Projects: Construction Engineering & Construction (Operational projects require approval before conducting business activities; the specific business scope is subject to the approval results). General Projects: Flooring Sales; Building Materials Sales; Mechanical & Electrical Equipment Sales; Architectural Decoration Materials Sales; Hardware Products Wholesale (Except for operational projects, conduct business activities independently and lawfully based on the business license).


价 格Negotiable
最小起订0 Piece库存0 Piece
Business Card
Vinyl Ester Corrosion-Resistant F
Negotiable
Full Steel PVC Anti-Static Floori
Negotiable
Solvent-free epoxy flooring
Negotiable
Rubber Track
Negotiable
Self-leveling cement flooring
Negotiable
High-rise Floor
Negotiable
Silicone PU sports flooring
Negotiable
Full Steel Edgeless Anti-Static F
Negotiable
Epoxy Anti-Static Flooring
Negotiable
OA Intelligent Suspended Activity
Negotiable
Application Scope
1. Static-dissipative flooring for chemical, powder, server rooms, control centers, oil storage tanks, etc., as required.
2. Factory floors for computer, electronic, microelectronic, communication, printing, precision instrument manufacturing, instrument manufacturing, and precision machinery manufacturing companies.
Performance Features
High compressive and impact resistance, high strength, and good toughness.
2. Resistance value 105-109Ω, with durable anti-static performance.
3. The lacquer film is smooth and has a quality texture.
4. Easy to clean and resistant to stains.
Construction Techniques
1. Surface Treatment: Perform sanding, repairs, and dust removal based on the condition of the surface.
2. Anti-static Undercoat: Coated with a highly penetrative and adhesive anti-static epoxy undercoat for enhanced surface adhesion.
3. Anti-static Intermediate Coating: Mix the epoxy resin with an appropriate amount of quartz sand, and apply it evenly with a trowel in one to two coats.
4. Copper Foil Laying: Conductive copper foil is laid in a well pattern to effectively dissipate static electricity buildup and is grounded.
5. Static-Dissipative Mortar: Apply in the number of layers as required, ensuring a smooth surface without holes, and free of trowel marks and sanding marks.
6. Static Dissipative Topcoat: Self-leveling static dissipative topcoat (single coat) or rolled-on topcoat (double coat), with an average volume surface resistivity of 1X10^6 to 1X10^9 Ω. The finished floor is bright, clean, and uniformly colored, without hollow spots.
7. Completion of Construction: 24 hours before occupancy, 72 hours before re-loading.
Process Diagram


Phone Consultation