Factory and building construction; outdoor sports facility construction; outd...
产品Price Negotiable
最小起订Quantity:1 square meters 供货总Quantity: 9999 square meters
Brand |
|
Features |
Permeable and Abrasion-Resistant |
Specs |
Overall flooring |
Construction Technology When the preliminary setting of the basic concrete is 5-6 degrees dry, spread the aggregates, striving for even distribution. 1. Spread 2/3 of the total amount, then compact and rub with a polished disc. 2. Apply 1/3 of the total spreading amount, and compact with a smoothing disc to rub the fibers. 3. After initial setting, apply one pass of polishing with a pressurized polisher. 4. Inspect the flatness after spreading the material, promptly apply more material to low spots for adjustment, then compact and abrade the area, followed by smoothing it out. 5. Prior to completion, use a polishing machine for polishing to achieve the finish.