High-strength Concrete Repair Material for Cement Road Surface - Factory Floor Repair Material Manufacturer_SupplyPro Co., Ltd._Sichuan Fan Chen New Material Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Sichuan Fan Chen New Material Technology Co., Ltd.

Rapid Repair Material for Concrete Pavements, High-Strength Repair Material f...

Consultation Hotline
13880207650

News Center Co., Ltd.

Product Categories

Contact Information
  • Contact person:谭超
  • Telephone:13880207650
  • 邮件:569964938@qq.com
  • Mobile:13880207650

Home > SupplyPro Co., Ltd. > High-strength Concrete Repair Material for Cement Road Surface - Factory Floor Repair Material Manufacturer
High-strength Concrete Repair Material for Cement Road Surface - Factory Floor Repair Material Manufacturer
品牌: Fan Chen
Usage: Road repair
Application Range: Cement pavement repair
Color: Grey
单价: 1.00/kilogram
最小起订Quantity: 1 kilogram
供货总Quantity: 9999 kilogram
有效期至: 长期有效
最后更新: 2024-11-30 17:29
 
详细Info

Sichuan Fan Chen New Materials rapid repair material for cement road surfaces is primarily used for repairing damages, honeycombing, rough surfaces, sanding, peeling, exposed aggregates, frost-thawing, and micro-cracks on cement concrete road surfaces in high-speed and low-speed roads, toll stations, service areas, gas stations, airports, bridge expansion joints, factory ground, rural roads, etc. After repair, the road can be reopened for traffic in just 2-3 hours.
Product Features:
1. Fast curing at room temperature, traffic can be reopened within 2 hours after road repair.
2. The system is alkaline-based, highly compatible with cement, and does not cause corrosion to steel bars.
3. Non-flammable, easy to store and transport.
4. Strong adhesion, resistance to peeling, and excellent durability; thermal expansion coefficient close to concrete.
5. Restores the original performance of concrete pavements while offering excellent impermeability.
6. Repaired areas match the original concrete color closely.
Construction Tip: The Importance of Milling and Boring
1. Prevents the original surface from continuously powdery, enhancing the adhesion between the repair layer and the original surface.
2. Prevent hollowing between the patch layer and the original pavement, which may affect durability.
3. Enhance the stability of the repair layer against crushing and non-peeling.
Enhance the integration of new and old surface layers.
Packaging and Storage:
Packaged in high-strength woven bags, thin layer: 25KG/bag, thick layer: 50KG/bag, shelf life is 3 months.
Store in a dry, well-ventilated room; seal packaging bags and prevent moisture and freezing.

Material Mixing: Pour the repair material into the mixing drum, add 4kg-4.5kg of water per bag (water content is 16%-18% of the repair material weight), use a handheld electric drill mixer to blend, mix for 1-2 minutes until the slurry is free of lumps and no dust clumps, then it's ready for use.
Our company adheres to the principle of "people-oriented service" and, in launching products to the market, follows the guiding principle of "quality for survival." Guided by the business philosophy of "deepening the market and delving into users," we provide comprehensive supply chain guarantees. We aim to establish a professional service standard!

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

13880207650