Factory Address for Road Fast Repair Material - Ground Repair Material_SupplyPro Co., Ltd._Sichuan Fan Chen New Material Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Sichuan Fan Chen New Material Technology Co., Ltd.

Rapid Repair Material for Concrete Pavements, High-Strength Repair Material f...

Consultation Hotline
13880207650

News Center Co., Ltd.

Product Categories

Contact Information
  • Contact person:谭超
  • Telephone:13880207650
  • 邮件:569964938@qq.com
  • Mobile:13880207650

Home > SupplyPro Co., Ltd. > Factory Address for Road Fast Repair Material - Ground Repair Material
Factory Address for Road Fast Repair Material - Ground Repair Material
品牌: Fanchen
Application: Road repair
Application Scope: Concrete pavement repair
Color: Grey
单价: 1.00/kilogram
最小起订Quantity: 1 kilogram
供货总Quantity: 9999 kilogram
有效期至: 长期有效
最后更新: 2024-11-30 17:27
 
详细Info

This product is categorized into: Thin-layer Rapid Repair Material, with a construction thickness of 3mm to 5mm; Thick-layer Rapid Repair Material, with a construction thickness of more than 3cm. Its excellent impact resistance, early strength and high strength, wear resistance, impermeability, high bonding strength, and resistance to concrete plastic shrinkage strain make it an ideal material for rapid repair of concrete pavement defects.
Packaging and Storage:
Packaged in high-strength woven bags, thin layer: 25KG/bag, thick layer: 50KG/bag, shelf life is 3 months.
Store in a dry, well-ventilated room; keep packaging bags sealed, and be cautious of moisture and frost.
Maintenance: After repair, touch the material with your hand

Construction Tip: The Importance of Milling and Boring
1. Prevents the original surface from continuing to powder, enhancing the adhesion between the repair layer and the original surface.
2. Prevent hollowing between the patch layer and the original road surface, which may affect durability.
3. Enhance the stability of the repair layer against crushing and ensure non-flaking.
4. Enhance the integration of new and old surface layers.

Repair: Directly pour the well-mixed repair material onto the working surface, then spread it out quickly with a large trowel. Follow with a defoaming roller or a small trowel for a quick smoothing process to ensure the road surface remains level. The beauty of the road surface largely depends on this step. The entire process should be completed within 10 minutes.
Our company adheres to the corporate spirit of "diligence, perseverance, and responsibility" and operates on the principles of "integrity, win-win, and innovation." We foster a positive corporate environment with a new management model, advanced technology, comprehensive service, and excellent quality as our foundation. We always prioritize customer satisfaction, serving with dedication and using our services to touch and impress our clients.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

13880207650