Automatic Settlement Supply | Ground Settlement Monitoring | Here Prices Are More Competitive_SupplyPro Co., Ltd._Shaanxi Hengrui Measurement and Control Systems Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Automatic Settlement Supply | Ground Settlement Monitoring | Here Prices Are More Competitive

产品Price 99.00/Tai

最小起订Quantity:1 Tai 供货总Quantity: 10000 Tai

Location:
Shaanxi/Baoji
有效期至:
长期有效
最后更新:
2024-07-17 14:59
Product Details

The stratified settlement gauge is composed of multiple single-point settlement units connected by PVC pipes. It is suitable for measuring displacement between multi-layer soil and a relatively stationary point (bedrock), allowing for long-term monitoring and automated measurements.

The advantages of the static level gauge: high measurement accuracy, strong stability, and unaffected by low temperatures. Primarily used to determine the vertical settlement of the object being measured through the measurement of liquid level height. Mainly applied in the settlement observation of subway, tunnels, bridges, building foundations, etc.

The static level gauge is typically installed on a pier at the same height as the object being measured or on a line of the same height on the object's wall. Data is usually automatically collected and stored in the field collection system using a single-machine version of the collection software within the on-site collection box, and then transmitted to the backend network version software via wired or wireless communication, thereby achieving automated observation.

The primary purpose of railway settlement monitoring

1. Obtain data on the subgrade load and natural settlement observations for newly constructed ballastless track roads with speeds of 200-350 km/h.

2. Monitor to obtain the real status and deformation trends of different structural settlements in the project.

3. Monitor the dynamic changes in settlement during subgrade compaction to provide timely and reliable information for later settlement assessment, evaluating the safety of the foundation under ballastless track under load and natural settlement.

4. Provide forecasts for potential engineering safety hazards to enable the implementation of effective measures and prevent accidents from occurring.


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》