The building is a frame brick and concrete structure, measuring 43 meters in length, 8.1 meters in width (with a partial 4-story section), and has a total floor area of 1393.2 square meters (with a basement foundation depth of 6 meters). It presented significant construction challenges, requiring the use of double beam support replacement technology for rolling sliding. The construction timeline was in December 2018, with a duration of 60 days.