Drift Reducer Test Bench_Product Center Co., Ltd._Hull减速机Test Bench, Supply, Machinery Equipment Website_Nantong Yuanchen Measurement & Control Equipment Co., Ltd._Zhongshang 114 Industry Resources Network
Nantong Yuanchen Measurement & Control Equipment Co., Ltd.

Complete testing equipment, brake systems, clutches, tensioners, and aligners manufacturing and sales; mechanical parts processing; electromechanical product repair. (Operations subject to license, license required) (As required by laws and regulations, business operations are subject to relevant provisions of the administrative license.)

全国咨询热线
0513- 88901256  13057020018


Drift Reducer Test Bench

价      格Negotiable

最小起订1 Tai库存0 Tai

Location
Jiangsu Nantong
有效期至
长期有效
最后更新
2023-09-15 17:08
View Count
133

Business Card

  • Your company's名称Nantong Yuanchen Measurement & Control Equipment Co., Ltd.
  • 联 系 人许经理 (先生)
  • Your company'sPhone0513- 88901256
  • Mobile号码13057020018
  • Company AddressJiangsu Haian High-tech Industrial Park Accelerator, No. 8

买家正在看

  • Horizontal Directional Drilling Machine Test Bench

    Negotiable

  • Permanent Magnet Synchronous Motor Test Bench

    Negotiable

  • Electrical Eddy Current Dynamometer

    Negotiable

  • Elevator Host Power Dynamometer

    Negotiable

Product Details

Scope

The reducer's performance parameters have been verified to meet design requirements through testing, with a firm connection and reliable sealing.

2. Reference Standards

JB/T 9050.3-1999 Cylinder Gear Reducer Loading Test Method

3. Sample Part Requirements

3.1 General Provisions on the Quantity of Test Articles

Test pieces are products or prototypes awaiting shipment.

3.2 Material and processing accuracy of the test pieces

The materials, heat treatment, and machining of the main components must be qualified with inspection records. Check production inspection records or randomly inspect key items prior to testing if necessary.

4. Requirements for Test Equipment

Loading test bench, reducer test bench

160kW/55kW Integrated Digital Multi-functional Wheel Hub Planetary Reduction Test Bench

5 Installation and Commissioning

All testing equipment (excluding electrical power supply units) should be installed (or assembled) on the same platform, with each component levelled, centered, and the system operating flexibly. Perform static zeroing first, followed by dynamic zeroing.

6 Test Content and Requirements

6.1 Requirements for Factory Testing of Planetary Reduction Section

6.1.1 Empty Load Test

Test conducted at the rated speed of 1890 rpm.

b) The reducer operates continuously for 20 minutes.

Requirements: (1) All connecting and fastening parts must not loosen; (2) Operation must be smooth with no abnormal sounds; (3) Sufficient lubrication with no leakage at any sealing or junction points; (4) Measure and record the shell temperature at the oil sump and bearing (oil temperature should be below 80℃); (5) Record and draw the oil sump temperature rise curve of the reducer under no-load conditions.

6.1.2 Load Test

Test conducted at rated speed of 1890 rpm.

b) Load sequentially at 25% (32kW), 50% (63.5kW), and 75% (95kW) of the rated input power, with the reducer operating continuously for 25 minutes at each stage.

(1) All connectors and fasteners must be securely fastened; (2) Operation should be smooth with no unusual noises; (3) Proper lubrication with no leakage at any sealing or junction points; (4) Record the speed, torque, and power of the reducer; (5) Measure and record the housing temperature at the oil sump and bearings (oil temperature should be below 90°C); (6) Record and draw the oil sump temperature rise curve of the reducer under corresponding load.


 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
0513- 88901256