Changzhou Old Wall Renovation Construction Project_SupplyPro Co., Ltd._Changzhou Old Wall Renovation Construction, Supply, Machinery Equipment Net, Industrial Belts_Wuxi Jianyu Building Energy Conservation Engineering Co., Ltd._Zhongshang 114 Industry Resources Network
Wuxi Jianyu Building Energy Conservation Engineering Co., Ltd.

Wall Repair, Old Wall Renovation, Residential Renovation, Wall Renovation, Wall Repairing, Aging Community Transformation, Roof Leak Repair, Specialized Wall Repair, External Wall Insulation, Internal Wall Insulation, Villa Renovation

全国服务咨询热线
0510-83748883  13921199826


Changzhou Old Wall Renovation Construction Project

价      格Negotiable

最小起订0 Piece库存0 Piece

发货时限
3 Days发货
Location
Jiangsu Wuxi
有效期至
长期有效
最后更新
2023-05-09 16:42
View Count
130

Business Card

  • Your company's名称Wuxi Jianyu Building Energy Conservation Engineering Co., Ltd.
  • 联 系 人高文华 (先生)
  • Your company'sPhone0510-83748883
  • Mobile号码13921199826
  • Company Address2 Yannan New Road, Wuxi, Huishan District

买家正在看

  • Xishan District renovation construction of old house projects

    Negotiable

  • Wuxi Villa Renovation Construction Plan

    Negotiable

  • Wuxi District Wall Renovation Construction Team

    Negotiable

  • Wuxi Xishan District: Where to find the best floor repair services?

    Negotiable

Product Details



Construction Method:

1. Basic Repair Treatment. The first step in renovating old walls is to perform basic repair treatment. When dealing with the base, we can use tools like wire brushes or electric grinders to clean the walls. For old coatings with an extremely high bond strength to the base, if cleaning is difficult, we can use paint strippers and other solvents to treat the base of the wall, allowing the paint on the old surface to swell before scraping it off.

2. After repairing cracks in the cement mortar wall, treat with waterproof cement mortar or waterproofing agent, then apply two coats of water-repellent agent before painting. For refinishing old ceramic tiles and granite facades, remove the old decorative layer with a steel chisel, then apply cement mortar and proceed with the painting.

3. Coating Materials. After repairing the walls and applying the putty, we can proceed to apply the paint. For paints, we can opt for emulsion architectural paint, solvent-based architectural paint, or inorganic paint. These types of coatings have good environmental performance and cause minimal harm to humans. As for the application process, we recommend painting from top to bottom to ensure even coverage. Typically, two coats are applied, and it's important to wait until the first coat is at least 80% dry before applying the second coat.


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
0510-83748883