Glass Fiber Geogrid_SupplyPro Co., Ltd._Taian Longwang Engineering Materials Co., Ltd.
欢迎来到Taian Longwang Engineering Materials Co., Ltd.!
  • 销售热线:15610331018  15610331018


Glass Fiber Geogrid

价      格Negotiable

最小起订0 Piece库存0 Piece

Location
Shandong Tai'an
有效期至
长期有效
最后更新
2022-02-22 14:01
View Count
33

Business Card

  • Your company's名称Taian Longwang Engineering Materials Co., Ltd.
  • 联 系 人刘经理 (先生)
  • Your company'sPhone15610331018
  • Mobile号码15610331018
  • Company AddressLongteng Road East, Middle Section of Longji Street, Taian High-Tech Industrial Development Zone, Shandong Province

买家正在看

  • Polypropylene mesh fiber

    Negotiable

  • Polypropylene coarse fiber

    Negotiable

  • Polyacrylonitrile fiber

    Negotiable

  • Polypropylene Mesh Fiber Manufacturer

    Negotiable

Product Details

Glass fiber geogrid is primarily made from alkali-free, untwisted coarse glass fiber yarn, woven into a mesh structure material through specific weaving techniques. To protect the glass fiber and enhance overall performance, it undergoes a special coating process, forming a new, excellent geosynthetic base material.

The main component of glass fiber is silicon dioxide, an inorganic material with stable physical and chemical properties. It boasts high strength, high modulus of elasticity, excellent wear resistance, and superior cold resistance with no long-term creep; good thermal stability; and a reticulated structure that locks and restricts aggregates, enhancing the load-bearing capacity of asphalt mixtures. Due to the special modified asphalt coating on its surface, it exhibits dual composite properties, combining the superior characteristics of glass fiber with the compatibility of asphalt mixtures, significantly improving the wear resistance and shear resistance of geogrids.

The laying surface of the glass fiber geogrid should be relatively flat. After the laying layer has passed inspection, to prevent longitudinal skewing, first mark white lines or hang strings along the width of the laying layer. Then, begin laying and use nails to secure the ends of the geogrid (8 nails per meter width, evenly spaced). After securing the ends, pull the geogrid forward slowly using a laying machine, pulling and straightening it manually every 10 meters. Continue this process until a roll of geogrid is laid, then lay the next roll in the same manner. After laying a roll, use a roller compactor of 6T-10T to roll over the entire length from the starting point in the forward direction. (If laying on the middle layer or leveling layer, a steel roller compactor is recommended; if the geogrid is laid directly on the concrete road surface, a rubber roller compactor is more suitable.) For subsequent laying, use the roll length as the section length for laying. After filling the section with geogrid, check the laying quality again. Then proceed to lay the next section. When laying the next section, overlap the geogrids by 10-15 cm and secure them with nails or wooden wedges before continuing to lay the next section forward. Repeat this process, maintaining the same operational requirements.


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
15610331018