Xi'an Event Planning Company | Event Planning | Grand Opening Celebrations | Brand Launch Events | Annual Meeting Planning | Conference Planning | Stage Construction | Stage Equipment Rental | Lighting and Sound Equipment Rental | LED Screen Rental
价 格Negotiable
最小起订0 piece库存0 piece
Exhibition Event Planning
Negotiable
LED Screen Rental
Negotiable
Stage truss assembly
Negotiable
Luminous and Audio Equipment Rent
Negotiable
Grand Opening Celebration Plannin
Negotiable
Brand Launch Event
Negotiable
LED Stage Rental Screen
Negotiable
LED Screen Rental
Negotiable
Entertainment equipment rental
Negotiable
Stage equipment rental
Negotiable
13 Steps to Stage Setup at the Event Venue
1. First, position the stage's two support legs roughly on the ground.
2. Insert the slanting rods on both sides into the pins on the set-up legs, remember not to install check valves.
3. Next, secure the stage frame into the U-slot on top of the leg, at which point the first set of the stage is fully assembled.
4. Place the leg adjacent to the previous one side by side.
5. Then, choose to connect the two tension rods with the original leg, which will secure the leg in place.
6. Then lay the shelf frames, with both frames sharing a central support leg, both frames placed inside the U-channel.
7. And so on, it can be endlessly extended.
8, The next column is assembled in the same way, tightly packed.
9. Insert the side tension rods into the pins above the legs and secure the check valve.
10. The stage frame also needs to be secured into the U-shaped槽 on top of the leg, at which point the *set of stage is fully assembled.
11. Place one leg next to the others.
12, Then connect the two tension rods and the original support leg together, and the leg will be securely fastened.
13. Lay the shelf frames flat, placing both frames into the U-channel on the central leg shared by the two frames.

Phone Consultation