Bridge Leveling (Wedge) Steel Plate_SupplyPro Co., Ltd._Bridge Leveling (Wedge) Steel Plates, Supply, Machinery Equipment Network_Hengshui Tongxiang Bridge Components Co., Ltd._Zhongshang 114 Industry Resources Network
Hengshui Tongxiang Bridge Components Co., Ltd.

Pipe plug bladders, rubber supports, support steel plates, bowl-shaped supports, spherical supports, bridge expansion joints

全国咨询热线
15933830777  15933830777


Bridge Leveling (Wedge) Steel Plate

价      格Negotiable

最小起订0 Piece库存0 Piece

Location
Hebei Hengshui
有效期至
长期有效
最后更新
2022-04-08 11:04
View Count
24

Business Card

  • Your company's名称Hengshui Tongxiang Bridge Components Co., Ltd.
  • 联 系 人马召勇 (先生)
  • Your company'sPhone15933830777
  • Mobile号码15933830777
  • Company AddressHebei Province, Hengshui City, Taoyuan District, Beiliu Village, East of Zhengjia Riverbank Town

买家正在看

  • Rubber Water Plug (Airbag)

    Negotiable

  • Water Stop Air Bag for Pipes

    Negotiable

  • Water-tightness Test Bladder

    Negotiable

  • Pipe Plugging Device

    Negotiable

Product Details

During the construction of highway bridges, Liang Diaoping steel plates are used in addition to the installation of expansion joints, rubber supports, and rubber waterstops for highway bridges. These are used to ensure uniform stress distribution and shear deformation in the rubber supports of the bridge. Above and below the rubber supports, there are matching steel plates, which are used for constructing railway bridges, highway bridges, and cross-sea bridges, etc. They are required to have high strength and toughness, capable of withstanding the loads and impacts of locomotives and vehicles, and exhibit good fatigue resistance, certain low-temperature toughness, and atmospheric corrosion resistance. The gap between the leveling steel plate and the bedding stone should also be filled with epoxy resin mortar to ensure compactness and equal strength. After the supports are installed, the pre-buried steel plate at the bottom of the beam is connected to the top steel plate of the support with bolts.

(1) Bridge leveling steel plate construction preparation: The notch at the tip of the pile should be sealed before driving the pile to prevent soil from entering; the lock should be coated with butter or other lubricants. For steel plate piles that are old, poorly maintained, deformed at the lock, and severely rusted, repairs and corrections should be made. Bent piles can be straightened using hydraulic jacks or by heating with fire.

(2) Piling section delineation.

During the pile driving process, two theodolites are used to control the verticality of the steel sheet piles in two directions.

(4) The position and direction of the first and second steel sheet piles to be driven should be ensured to serve as a guide template. Therefore, a measurement should be taken after every 1m of driving. Once the predetermined depth is reached, immediately use rebar or steel plate to temporarily secure it with an electric weld to the bracing support. The above content is compiled by Hengshui Tongxiang Bridge Fittings Co., Ltd. based on issues encountered in actual customer work for reference purposes. Please communicate or correct any issues promptly. The leveling steel plate for bridges is also commonly referred to as the bearing embedded steel plate, bottom steel plate of the beam, wedge-shaped steel plate, leveling steel plate, matching steel plate for bridge bearing, upper steel plate of the bridge bearing, lower steel plate of the bridge bearing, upper and lower steel plates of the bridge bearing, matching steel plate for rubber bearing, upper steel plate of the rubber bearing, lower steel plate of the rubber bearing, and upper and lower steel plates of the rubber bearing.


 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
15933830777