Yijin Pipe - Large Diameter Insulating Fitting Working Principle - Large Diameter Insulating Fitting Function_SupplyPro Co., Ltd._Yijin Pipe - Large Diameter Insulating Joint Working Principle, Functions, Supply_Hebei Yijin Pipe Manufacturing Co., Ltd._Zhongshang 114 Industry Resources Network
Hebei Yijin Pipe Manufacturing Co., Ltd.

Pipe Fittings | Insulating Joints | Insulating Flanges

全国服务咨询热线
13831781381  


Yijin Pipe - Large Diameter Insulating Fitting Working Principle - Large Diameter Insulating Fitting Function

价      格80.00

最小起订1 A库存9999 A

发货时限
3 Days发货
Location
Hebei Cangzhou
有效期至
长期有效
最后更新
2022-03-12 12:55
View Count
72

Business Card

  • Your company's名称Hebei Yijin Pipe Manufacturing Co., Ltd.
  • 联 系 人刘铁雷 (先生)
  • Your company'sPhone13831781381
  • Company AddressHebei Province, Yanshan County, Puwa Industrial Park, Cangzhou City

买家正在看

  • Yijin Pipeline - Carbon Steel Gas Pipeline Insulating Joints, Stainless Steel Underground Integral Type Custom Manufacturing

    80.00

  • Yijin Pipe - Large Diameter Insulating Fitting Working Principle - Large Diameter Insulating Fitting Function

    80.00

  • High-pressure Insulation Flange Manufacturer | Custom Insulation Joints for Natural Gas Pipelines

    80.00

  • Yijin High Voltage Insulating Flange Manufacturer - Custom Insulating Joints for Natural Gas Pipelines

    80.00

Product Details
Materials:
Carbon Steel
Pressure-resistant:
PN1.0 to PN40 MPa
Available for sale:
National

Fully assembled and tested insulated joints and flanges should undergo individual hydrostatic testing on a test bench. The test pressure should be 1.5 times the design pressure and at least 0.1MPa higher than the design pressure. The hydrostatic test should be conducted using clean water, and the duration of the test (after stabilization) should be no less than 30 minutes. The test is considered pass if there are no leaks at the flange connections, no damage to the insulated components, and no visible residual deformation in the flanges or fastening insulated parts.

All pipelines transporting flammable, explosive, and toxic gases should be equipped with insulated joints and flanges, and must undergo an airtightness test under the design pressure before shipment.

Insulation joints of the same specification should undergo hydrostatic and bending moment tests with a quantity of 5% but not less than 1, each. While maintaining the test pressure, a loading device is used to apply a bending moment to the product. This bending moment should be sufficient to induce a longitudinal stress on the connected piping that is not less than 72% of the pipe material's yield strength under the same bending moment.

If any damage, leakage, or defect is found, an additional random inspection of 5% of the same type of products, with a minimum of 1 unit, is required. If there are still non-compliant products, all the insulating joints of that specification should undergo full hydraulic pressure and bending moment tests.


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13831781381