Hangzhou Manhang Flooring Engineering Co., Ltd.VIP

许可项目:建设工程施工(依法须经批准的项目,经相关部门批准后方可开展经营 活动,具体经营项目以审批结果为准)。一般项目:地板销售;建筑材料销售;机械电气设备销售; 建筑装饰材料销售;五金产品批发(除依法须经批准的项目外,凭营业执照依法自主开展经营活动)
Enter Shop

Epoxy Anti-Static Flooring

平台认证
  • Unit Price

    Negotiable

  • Brand

    -

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



杭州满航地坪工程有限公司

VIP   数字营销第4年
资料通过中商114认证
Category
  • No Category

Product Details

Specs

Gallery

  • Brand:

    -

  • Unit Price:

    Negotiable

  • MOQ:

  • Total:

    0Piece

  • Address:

    ZhejiangHangzhou

  • Delivery:

    3days

  • View More

Description

Application Scope

 

1. Static-dissipative flooring for chemical, powder, server rooms, control centers, oil storage tanks, etc., as required.

 

2. Factory floors for computer, electronic, microelectronic, communication, printing, precision instrument manufacturing, instrument manufacturing, and precision machinery manufacturing companies.

 

Performance Features

 

High compressive and impact resistance, high strength, and good toughness.

 

2. Resistance value 105-109Ω, with durable anti-static performance.

 

3. The lacquer film is smooth and has a quality texture.

 

4. Easy to clean and resistant to stains.

 

Construction Techniques

 

1. Surface Treatment: Perform sanding, repairs, and dust removal based on the condition of the surface.

 

2. Anti-static Undercoat: Coated with a highly penetrative and adhesive anti-static epoxy undercoat for enhanced surface adhesion.

 

3. Anti-static Intermediate Coating: Mix the epoxy resin with an appropriate amount of quartz sand, and apply it evenly with a trowel in one to two coats.

 

4. Copper Foil Laying: Conductive copper foil is laid in a well pattern to effectively dissipate static electricity buildup and is grounded.

 

5. Static-Dissipative Mortar: Apply in the number of layers as required, ensuring a smooth surface without holes, and free of trowel marks and sanding marks.

 

6. Static Dissipative Topcoat: Self-leveling static dissipative topcoat (single coat) or rolled-on topcoat (double coat), with an average volume surface resistivity of 1X10^6 to 1X10^9 Ω. The finished floor is bright, clean, and uniformly colored, without hollow spots.

 

7. Completion of Construction: 24 hours before occupancy, 72 hours before re-loading.

 

Process Diagram

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery ZhejiangHangzhou3dayswithin
Expiry Long Valid
Update 2022-11-23 09:18
Gallery

Hangzhou Manhang Flooring Engineering Co., Ltd.Published byEpoxy Anti-Static FlooringGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top