Nantong Yuanchen Measurement & Control Equipment Co., Ltd.VIP

成套检测设备、制动器、离合器、张力器、纠偏器生产、销售;机械配件加工;机电产品修理。(涉及许可的凭许可证经营)(依法须经批准的项目,经相关部门批准后方可开展经营活动)
Enter Shop

Drift Reducer Test Bench

平台认证
  • Unit Price

    Negotiable

  • Brand

    -

  • MOQ

    1Tai

Contact
Leave Msg

Platform Service

Supplier Verified



南通远辰测控设备有限公司

VIP   采商通第4年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    -

  • Unit Price:

    Negotiable

  • MOQ:

    MOQ1Tai

  • Total:

    0Tai

  • Address:

    JiangsuNantong

  • Delivery:

    0Hours

  • View More

Description

Scope

The reducer's performance parameters have been verified to meet design requirements through testing, with a firm connection and reliable sealing.

2. Reference Standards

JB/T 9050.3-1999 Cylinder Gear Reducer Loading Test Method

3. Sample Part Requirements

3.1 General Provisions on the Quantity of Test Articles

Test pieces are products or prototypes awaiting shipment.

3.2 Material and processing accuracy of the test pieces

The materials, heat treatment, and machining of the main components must be qualified with inspection records. Check production inspection records or randomly inspect key items prior to testing if necessary.

4. Requirements for Test Equipment

Loading test bench, reducer test bench

160kW/55kW Integrated Digital Multi-functional Wheel Hub Planetary Reduction Test Bench

5 Installation and Commissioning

All testing equipment (excluding electrical power supply units) should be installed (or assembled) on the same platform, with each component levelled, centered, and the system operating flexibly. Perform static zeroing first, followed by dynamic zeroing.

6 Test Content and Requirements

6.1 Requirements for Factory Testing of Planetary Reduction Section

6.1.1 Empty Load Test

Test conducted at the rated speed of 1890 rpm.

b) The reducer operates continuously for 20 minutes.

Requirements: (1) All connecting and fastening parts must not loosen; (2) Operation must be smooth with no abnormal sounds; (3) Sufficient lubrication with no leakage at any sealing or junction points; (4) Measure and record the shell temperature at the oil sump and bearing (oil temperature should be below 80℃); (5) Record and draw the oil sump temperature rise curve of the reducer under no-load conditions.

6.1.2 Load Test

Test conducted at rated speed of 1890 rpm.

b) Load sequentially at 25% (32kW), 50% (63.5kW), and 75% (95kW) of the rated input power, with the reducer operating continuously for 25 minutes at each stage.

(1) All connectors and fasteners must be securely fastened; (2) Operation should be smooth with no unusual noises; (3) Proper lubrication with no leakage at any sealing or junction points; (4) Record the speed, torque, and power of the reducer; (5) Measure and record the housing temperature at the oil sump and bearings (oil temperature should be below 90°C); (6) Record and draw the oil sump temperature rise curve of the reducer under corresponding load.


Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery JiangsuNantong
Expiry Long Valid
Update 2023-09-15 17:08
Gallery

Nantong Yuanchen Measurement & Control Equipment Co., Ltd.Published byDrift Reducer Test BenchGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top