Rope Coating Machine Operation Process
1. Keep up the good work.
Upon arrival of the hydraulic hose fitting machine, first oil the machine with brand 46 anti-wear hydraulic oil, avoid low-quality
Fuel quality can affect performance, such as increased noise and slower up and down speeds. Prolonged use of poor-quality oil can easily damage the oil pump.
Cause damage, affecting the lifespan of the oil pump. Oil is added through the filter port, ensuring no impurities enter the oil tank. Oil should be added to at least:
Level gauge midpoint.
2. Power Connection:
Then, connect the power supply according to the voltage of the collar machine you purchased (380V or 220V).
3. Machine Trial
Now you can start using the machine. Before installing the mold, run it up and down a few times to test it.
Is the circuit functioning properly, and is the machine operating up and down correctly?
4. Mock-up
The mold should be aligned properly, ensuring that the upper and lower mold cavities are perfectly matched. Misalignment is strictly prohibited. If there is a misalignment between the upper and lower mold cavities, the pressing process should be halted.
The finished aluminum sleeve shows an uneven surface, and such a fixed pipe wall thickness inconsistency leads to stress concentration, which can cause the hoisting rope to break.
Fractured at the thin-walled section during tensile testing.
| Pressure | 100-5000KN | Power Voltage | 220V or 380V |
| One-time compression rope diameter | Φ1-Φ32 | Power | 4KW or 5.5KW |
| Multiple diameter压制绳 | Φ1-Φ36 | Frequency | 50Hz |
| Itinerary | Customer-Customized | Work pressure | 28Mpa |
| Work Itinerary | User Customization | Piston upward speed | 5.6/s |
| Dimensions (Length x Width x Height) | Piston downstroke speed | 8.6/s | |
| Net Weight | Color | Blue hammer texture or custom by user |

































