Construction Process of Purification Engineering:
1. Communication, site visit
Before initiating a project, it's crucial to have thorough communication with the client and conduct on-site inspections to understand their needs, so as to determine and provide a reasonable and tailored solution.
2. Design
The engineering company, based on preliminary communication and on-site inspection, has developed an initial design proposal and will adjust it according to the actual needs of the client.
3. Proposal Discussion
A proposal often requires multiple rounds of communication to be finalized.
4. Sign the contract
Before the project commences construction, adhering to the contract is essential to safeguard both parties' interests. The contract must specify the purification construction process and other details such as the project's cost.
5. Design Construction Drawings
After the contract is signed, the construction drawings will be issued, and the purification project will be carried out strictly according to this drawing.
6. Construction
This phase requires construction strictly according to the construction drawings.
7. Debugging and Testing
After completion of the project, adjustments must be made according to the contract requirements and acceptance specifications, while simultaneously checking if all processes comply with standards.
8. Acceptance
If the inspection is error-free, the next step is the acceptance process. The item can only be officially put into use after acceptance is completed.