Construction Process of Purification Engineering:
1. Communication, site visits
Before initiating a project, it is crucial to have comprehensive communication with the client and conduct on-site inspections to understand their needs, in order to determine and present a feasible plan.
Design
The engineering company has developed an initial design plan based on preliminary communications and on-site inspections, adjusting it according to the actual needs of the client.
3. Solution Exchange
A proposal often requires multiple communications to finalize the plan.
4. Sign the contract
Before the project begins construction, it is necessary to follow the contract to ensure the rights and interests of both parties. The contract must specify the purification construction process and other details such as the project's cost.
5. Design construction drawings
After the contract is signed, the construction drawings will be issued, and the purification project will be carried out strictly according to this drawing.
6. Construction
This phase requires construction strictly according to the construction drawings.
7. Debugging and Inspection
After the project is completed, adjustments must be made according to the contract requirements and acceptance specifications, while also verifying if all processes meet the standards.
8. Acceptance
If the inspection is free of errors, the next step is the acceptance inspection. Only after it is completed can the product be officially put into use.