Construction Process of Purification Engineering:
1. Communication, site visits
Before initiating a project, it's crucial to have thorough communication with the client and conduct on-site inspections to understand their needs, ensuring that the proposed solutions are both determined and reasonable.
Design
The engineering company has developed an initial design plan based on preliminary communications and on-site inspections, and is adjusting it according to the actual needs of the client.
3. Solution Discussion
A proposal often requires multiple communications to finalize the plan.
4. Sign the contract
Before the project begins construction, it is essential to act according to the contract to ensure the rights and interests of both parties. The contract must specify the purification construction process and the cost of the project, among other information.
5. Design construction drawings
After the contract is signed, construction drawings will be issued, and the purification project will be strictly carried out according to these drawings.
6. Construction
This phase requires construction strictly according to the construction drawings.
7. Debugging and Inspection
After completion of the project, adjustments should be made according to the contract requirements and acceptance specifications, while simultaneously verifying that all processes meet the standards.
8. Acceptance Inspection
If the inspection is error-free, the next step is the acceptance inspection, which must be completed before the product can be officially put into use.