Construction Process of Purification Engineering:
1. Communication, site visits
Before initiating a project, it's crucial to have thorough communication with the client and conduct on-site inspections to understand their needs, ensuring that we can provide a well-defined and reasonable proposal.
2. Design
The engineering company, based on preliminary communication and on-site inspection, has developed an initial design plan and will adjust it according to the actual needs of the owner.
3. Proposal Discussion
A proposal often requires multiple communications to finalize the plan.
4. Sign the contract
Before the project begins construction, it is essential to act in accordance with the contract to ensure both parties' rights and interests. The contract must specify the purification construction process and the cost of the project, among other information.
5. Design construction drawings
After the contract is signed, the construction drawings will be issued, and the purification project will be carried out strictly according to this drawing.
6. Construction
Construction must be strictly carried out according to the construction drawings at this stage.
7. Calibration and Testing
After the project is completed, adjustments must be made according to the contract requirements and acceptance specifications, while also verifying that all processes comply with standards.
8. Inspection
If the inspection is free of errors, the next step is the acceptance, which must be completed before the item can be put into official use.