Jiangsu Yuehua High-altitude Construction Coating Co., Ltd.VIP

高空建筑物防腐、维修、拆除、防雷、保温、清洗;
Enter Shop

Chimney Corrosion Prevention Company

平台认证
  • Unit Price

    Negotiable

  • Brand

    -

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



江苏悦华高空建筑防腐有限公司

VIP   采商通第3年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    -

  • Unit Price:

    Negotiable

  • MOQ:

  • Total:

    0Piece

  • Address:

    JiangsuYancheng

  • Delivery:

    3days

  • View More

Description

Company specializes in: removal, repair, reinforcement, corrosion prevention, beautification, installation, painting of aviation marks, painting of color rings, painting, and coating—a full range of high-altitude engineering projects. Construction is safe, quick, technically excellent, and cost-effective. We honor our agreements and look forward to a win-win cooperation with you!

Chimney painting and coating, as well as beautification work for navigation buoys, typically involve two methods of operation, both requiring high-altitude climbing. Workers ascend to the top of the chimney or platform, then proceed with the anti-corrosion work using either (1) high-altitude suspended rope or (2) a high-altitude basket.

Safety Points for High-altitude Anticorrosion Construction Work

Chimney anti-corrosion construction requires proficiency in the professional skills of this trade and adherence to all safety regulations.

2. Must be 18 years old and pass a physical examination before engaging in high-altitude work. Individuals with high blood pressure, heart disease, epilepsy, and other conditions unsuitable for high-altitude work are prohibited from ascending.

3. Any work surface more than 2 meters above ground level with an incline greater than 45 degrees, or where the working area lacks a stable standing place or is subject to vibration, should be considered as high-altitude work.

4. Protective gear must be worn properly, pants should be tucked in, a hard hat must be worn, and smooth-soled shoes are prohibited. A safety belt of sufficient strength is required, and the rope should be tied to a solid building structure or metal framework; it must not be attached to moving objects.

Before climbing, the construction supervisor should conduct on-site safety education for all personnel.

6. Inspect all climbing equipment and safety gear (such as helmets, harnesses, ladders, ramps, scaffolding, guardrails, safety nets, etc.), ensuring they are safe and reliable. Strictly prohibit any risky operations.

7. Mark off restricted areas on the ground in high-altitude work zones and hang up warning signs such as "No Trespassing" and "Access Prohibited."

8. Prior to working near power (low voltage) lines, a power outage must be arranged. Work can only be carried out after the outage is confirmed, and insulating barriers should be set up. Workers must stay at least 2 meters away from the power lines (low voltage), and it is prohibited to work under high-voltage lines.

9. Tools, parts, and materials used for high-altitude chimney anti-corrosion construction must be stored in a tool bag. No items should be held in hand during ascent or descent, and movement must be along designated routes; materials or tools should not be thrown from heights. Do not stack tools or materials that are prone to sliding on scaffolding; they must be kept orderly. After work is completed, all items that could fall, including tools, materials, and parts, should be cleaned up promptly to prevent injury from falling objects. When handling large parts, reliable lifting equipment should be used.

10. Always be aware of hazard signs and areas. Adequate lighting must be provided for night work; otherwise, construction is prohibited.

11. Strictly prohibit vertical work simultaneously on both levels. In case of special circumstances that require vertical work, approval from relevant leaders is required, and protective sheds or other isolation facilities should be set up between the two levels.

12. Absolutely no resting in elevated areas without guardrails to prevent falls.

13. Panels over 3m in length cannot accommodate two workers standing at the same time.

14. Walkways, ramps, gangways, and transport ways should be kept clean at all times.

15. No overhead work is allowed outdoors when wind speeds exceed level 6.


Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery JiangsuYancheng3dayswithin
Expiry Long Valid
Update 2024-03-01 11:20
Gallery

Jiangsu Yuehua High-altitude Construction Coating Co., Ltd.Published byChimney Corrosion Prevention CompanyGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top