Rainwater Pollution Intercept and Collection Device
Rainwater Pollution Trap Product Features: 1. Easy to clean, sediment and grid interceptors can drop into the basket. 2. Equipped with a 2mm stainless steel filter screen, filtering out most pollutants. 3. PE one-time injection molding, with a built-in 304 stainless steel finished product, ready for direct burial without installation.


Sewage Trapping Basket Assembly
The grease interceptor basket is the first step in the rainwater collection system, and it is a very crucial process. It effectively protects the normal operation of the downstream equipment, preventing larger debris from blocking the system.
Product Introduction
The wastewater interception basket device is the first step in the rainwater collection system, and it is also a very crucial step. It effectively protects the normal operation of the backend equipment and prevents the system from being blocked by large debris. Our wastewater interception basket efficiently intercepts large debris without causing blockages, allowing the sediment to settle inside, making it easy to clean.
Product Features
Easy to clean; sediment and grid interceptors can drop into the basket.
Equipped with a 2mm stainless steel filter, it removes most pollutants.
3. One-time PE injection molding with built-in 304 stainless steel finished product, ready for direct burial without laying.
4. It's easy to maintain. Generally, a disassembly and cleaning is required about every six months or a year.
5. Internally, the materials are made from high-quality stainless steel, ensuring a longer lifespan.
Automatic Sewage Disposal
Built-in 1mm grid mesh, effectively traps pollutants without clogging, enabling automatic discharge of wastewater.
Leverage Adjustment
The runoff rain volume can be adjusted via an internal lever, suitable for various catchment areas.
Auto-adjust
The entire unit is automatically adjusted by rainfall flow, requires no power supply or electrical equipment, and boasts high stability.
Easy to repair
Easy to disassemble and does not require specialized maintenance.
Initial rainfall effluent
For the initial 2-5mm of rain during the first rain, the rainwater is generally heavily polluted and discarded through the equipment.

































