    How to determine the amount of floor paint and proper subfloor treatment

    2024-10-26

    How much floor paint to use and how to handle the base treatment


    The application of the epoxy primer layer is a fundamental step in the epoxy flooring painting process. The primer layer sits between the subfloor and the epoxy coating, enhancing the adhesion between the coating and the ground. Many people wonder, how much epoxy primer is the right amount to use?


    The primary factor affecting the amount of epoxy floor primer used is the bonding strength of the floor's surface, which in turn impacts overall strength. Generally, the strength of concrete floors for epoxy floor painting should be greater than C25. The optimal amount of ground primer is usually between 0.05 to 0.2 kg/m². If the ground strength is low, the surface is loose, and sanding is prone to occur, the amount of epoxy floor primer will vary based on the actual environment and conditions. Additionally, if the bonding strength of the floor surface is low and insufficient epoxy floor primer is applied to increase the bonding strength, the quality of the epoxy floor will be poor. If heavy loads like forklifts are placed on the floor, the epoxy floor and its base may be compressed and cracked. Therefore, it is crucial to ensure even application of the primer during epoxy floor installation. If the overall ground strength is too low, epoxy mortar coatings can be chosen based on load-bearing and strength requirements, or the ground can be renovated if conditions permit.


    The degree of wear on new and old surfaces varies, of course. The extent of damage to old surfaces depends on the length of use and the varying degrees of load-bearing usage. Sometimes, the surface may develop large areas of pits and cracks. Therefore, it is essential to repair the surface before applying the epoxy primer. Repairing cracks and holes, as well as controlling the flatness of the surface, is quite necessary. For a relatively new surface with good strength and flatness, the general dosage is controlled between 0.05~0.2kg/m². For old surfaces, the actual situation should be professionally managed by construction personnel.


    If one lacks moral底线 in life, they will eventually become a societal pest. Similarly, if the subgrade treatment is not properly done for an epoxy floor, then that floor is one with serious quality issues.


    Improper base treatment can lead to the powdering of the floor surface. The base surface is covered with a lot of dust and sand, indicating that the base strength has not reached the standard for floor paint application. Proceeding with floor paint installation without treating the base first will affect the adhesion between the floor paint and the base. Moreover, the surface sand and gravel can impact the smoothness and aesthetics of the floor surface, easily causing delamination and powdering of the floor.


    Improper subgrade treatment can lead to floor cracking. Some subgrades are in poor condition, with numerous pits of varying sizes and depths. They require cleaning and filling. If not properly addressed, when floor construction is carried out over these pits, they turn into hollowed areas. During high-impact operations, this can easily cause the floor to crack and other issues.


    Improper surface treatment can lead to the peeling of floor paint films and oil pollution, which is a common issue with bare ground surfaces. Floor coatings have a penetrating function, allowing them to seep into the tiny pores of the bare ground, thereby enhancing the adhesion between the bare ground and the floor coating. If the oil pollution on the bare ground is not thoroughly cleaned, it can block the pores and prevent the floor coating from bonding properly with the surface, causing the paint film to easily peel off.


    If the subgrade of the flooring is not properly treated, it's like a person without a moral底线; the flooring will inevitably lead to destruction! Therefore, when carrying out flooring construction, it is crucial to ensure the proper treatment of the subgrade.



Contact us

Shanghai Hongyu Floor Coating Engineering Co., Ltd.

Service Hotline

13052015888

Company Telephone

13052015888

WeChat Number

18616126556

Address

288 Ningfu Road, 6th Floor, Building 1, Nanqiao Town, Fengxian District, Shanghai


Message Consultation

 Click submit means you agree to《Service terms》《Privacy policy》

www.114global.com © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click submit means you agree to《Service terms》《Privacy policy》