How to Install a Screw Actuator: Detailed Techniques_News Center Co., Ltd._Hebei Tielong Water Conservancy Machinery Co., Ltd.
Current Location:Home>News Center Co., Ltd.>How to Install a Screw Actuator: Detailed Techniques

    How to Install a Screw Actuator: Detailed Techniques

    2025-03-26
    The screw-driven shutter has a compact body and simple structure, offering sturdy reliability. The operation for maintenance is straightforward, and the price is also quite affordable. Within the allowable length-to-diameter ratio of the screw, it can exert a closing force on the gate. The nut and screw have an anti-backlash effect, meaning the gate can remain at any position without slipping off by itself, ensuring safety. 
    
    Generally, when installing the screw-driven shutter, maintain the levelness of the shutter base foundation, ensuring that the contact area between the base and the foundation is over 90% overlapping. The screw axis should be perpendicular to the horizontal plane measured on the weir deck, as well as perpendicular to the hinge holes on the gate plate, to prevent the screw from being crooked and causing localized stress that may damage the machinery. 
    
    Place the manual screw-driven shutter in the installation position, fit a limit disk onto the screw, and thread the screw from below the beam into the machine. Once the screw is visible from above, fit the limit disk onto it. The lower end of the screw connects to the gate. It is crucial that the foundation for installing the shutter is stable and secure. 
    
    The concrete for the machine base and foundation components should be cast according to the drawings. Do not remove or alter the temporary supports for the shutter until the concrete has reached the designed strength, and never perform trial assembly or operation during installation. Align the shutter according to the gate lifting centerline, ensuring that the longitudinal and transverse centerline errors do not exceed ±3mm, and the elevation errors do not exceed ±5mm. 
    
    Then, pour the second stage of concrete or connect with pre-buried steel plates. The installation of the electrical equipment for the shutter must comply with the drawings and specifications, and all electrical equipment should be reliably grounded. After the installation is complete, clean the machine, repair any damaged protective paint, and apply lubricant.


Contact us

Hebei Tielong Water Conservancy Machinery Co., Ltd.

Service Hotline

18603196907

Company Telephone

18603196907

Address

Xinhe County, Xingzhai Village, North


Message Consultation

 Click submit means you agree to《Service terms》《Privacy policy》

www.114global.com © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930