Nanjing Steel Pipe Scaffold CommonQuestion:
(1) It is crucial to have a clear understanding of heavy-duty scaffolding. Generally, if the floor thickness exceeds 300mm, it should be considered to design it as heavy-duty scaffolding. When the scaffold load exceeds 15KN/mm2, it is necessary to organize expert consultations. It is important to identify which parts of the steel pipe have a significant impact on load-bearing capacity. For formwork scaffolding, the upper length 'a' should not be too long, ideally less than 500mm (which may be revised in the new regulations), and the force on the upper and lower steps should be considered as major calculation points during the calculation of the uprights. When the load-bearing capacity does not meet the group requirements, the number of uprights should be increased to reduce the spacing.
Currently, there is a widespread issue in China with scaffolding materials, such as steel pipes, connectors, top and bottom props, that do not meet quality standards. These are not taken into account in theoretical calculations during actual construction.
Gate-type scaffolding and trapezoidal scaffolding are the two commonly used types of scaffolding in current construction projects. The trapezoidal scaffolding is a new type of quick-dismantling scaffolding, while some construction units are slower to embrace new things and still use gate-type scaffolding. The trapezoidal scaffolding was developed to address the issues of the previous gate-type scaffolding.
Activity scaffolding boasts excellent overall performance: equipped with footplates, parallel frames, clamping pipes, horizontal and diagonal tie rod pipes, and other cross-linking devices. It withstands forces reasonably: the vertical pressure is directly borne by the upright pipes, and all performance indicators meet construction requirements. Excellent fire resistance: all main frames and accessories are made of steel. According to user feedback and domestic and international data, the scaffolding can be reused over 30 times with proper maintenance, which is unmatchable by bamboo and wood frames.
The vertical rods of the climbing formwork are made of Φ48×3.2mm steel pipes. Standard rods are to be selected as much as possible, and for the floor height of this project, the standard model A2400 standard rods are chosen for connection to meet the height of the formwork frame. Since each vertical rod is equipped with a connecting sleeve, the total length of a single rod will increase by 100mm. Therefore, when selecting the vertical rods, the increased length should be considered to avoid overly long rods.