Integrated wastewater treatment equipment process_News Center Co., Ltd._Integrated wastewater treatment equipment process,Shandong Qingchuan Machinery and Equipment Co., Ltd._Shandong Qingchuan Machinery and Equipment Co., Ltd._Zhongshang 114 Industry Resources Network
欢迎访问Shandong Qingchuan Machinery and Equipment Co., Ltd.official website!
24-hour Service Hotline:15866139580  15866139580

Shandong Qingchuan Machinery and Equipment Co., Ltd.

Environmental Equipment, Wastewater Treatment, Environmental Management

 

Company Information

Location:Shandong/Weifang

会员级别:采商通4

身份认证:   

我的勋章:  通过中商114认证 [诚信档案]

Business Card

  • 公司名称Shandong Qingchuan Machinery and Equipment Co., Ltd.
  • 联 系 人赵乐芹 (先生)
  • 公司电话15866139580
  • 手机号码15866139580
  • Company Address2nd Floor, Shandong Weifang Free Trade Zone Innovation and Entrepreneurship Center
Home > News Center Co., Ltd. > Integrated wastewater treatment equipment process
News Center Co., Ltd.
Integrated wastewater treatment equipment process
Publish Time:2022-04-27        View Count:31        Return to List

The project employs the biofilm method: anaerobic - aerobic (A/O) treatment process. The A/O process, which stands for anaerobic + aerobic biological contact oxidation, is a mature biological treatment technology with high volume load, fast biological degradation speed, small land occupation, low infrastructure investment and operation costs. It can replace the conventional activated sludge method used in existing urban wastewater treatment, and is suitable for the treatment of medium to high concentration industrial wastewater. It offers cost savings, less land usage, and high treatment efficiency. This process combines biological contact oxidation with sedimentation, ensuring a mature and reliable technology. Sedimentation sludge in the equipment is further oxidized and decomposed due to the dissolved oxygen, with some of it being extracted and sedimented in the sand sedimentation pond. The sludge in the system only requires periodic extraction from the sand sedimentation pond. The operating procedures of the main control equipment such as fans and submersible pumps are input into the PLC to achieve automatic operation, reducing the workload and minimizing unnecessary human damage.

www.114global.com © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
15866139580