Main Products: High Temperature Thermal Oil Pumps, WRY Th...


Shut off the valves at the pipeline inlets and outlets, wait for the pump body temperature to drop, then unscrew the oil drain screw of the pump body to completely release the heat transfer oil.
Changzhou Wuyan High-Temperature Thermal Oil Pump Disassembly Procedure:
Remove the four bolts from the motor.
Separate the motor and pump coupling.
Remove the connecting bolts between the pump body and cover, then take out the pump.
Remove the impeller bolt and disassemble the impeller with a puller.
Remove the bolts between the pump cover and the bearing housing.
Remove the pump coupling.
Remove the bearing cap.
8. Separate the shaft, a bearing, and the bearing housing (pull the shaft towards the coupling direction).
Remove the other bearing from the bearing housing.
Tap the oil seal out towards the coupling direction.
The above is the disassembly sequence for Changzhou High-Temperature Oil Pump. When installing, do the opposite. When reassembling after disassembly, check for any failed mechanical seals and parts. If any signs of failure or damage occur, be sure to replace with new components. Be extremely careful during installation; do not敲打 to avoid damaging parts.
Please remind users to ensure the shaft alignment of the couplings is adjusted after the pump is re-installed (the deviation should be within 0.2mm). Re-adjust the shaft alignment of the couplings after heating for half an hour or when the temperature reaches 200°C to operate the hot oil pump normally.
Shandong Yantai Hot Oil Pump Pricing, Qingdao High-Temperature Oil Pump, supplied by Changzhou Wuyan Hot Oil Pump Manufacturer
Learn more about high-temperature hot oil pumps and thermal oil pumps at Wuyan, the Changzhou-based manufacturer of thermal oil pumps.
www.114global.com © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930
