License Projects: Construction Engineering & Construction (Operational projects require approval before conducting business activities; the specific business scope is subject to the approval results). General Projects: Flooring Sales; Building Materials Sales; Mechanical & Electrical Equipment Sales; Architectural Decoration Materials Sales; Hardware Products Wholesale (Except for operational projects, conduct business activities independently and lawfully based on the business license).


价 格Negotiable
最小起订0 Piece库存0 Piece
Business Card
Full Steel Anti-Static Floor
Negotiable
Outdoor Acrylic Sports Court Floo
Negotiable
Rubber Track
Negotiable
Vintage flooring
Negotiable
Artistic permeable pavement
Negotiable
Silicone PU sports flooring
Negotiable
PVC Plastic Flooring
Negotiable
Water-based epoxy flooring
Negotiable
Water-based polyurethane matte fl
Negotiable
Vinyl Ester Corrosion-Resistant F
Negotiable
Application Scope
Factory, school, residential housing, office, warehouse, food processing plant, chemical plant, supermarket, auto repair shop, heavy industry, garage, outdoor, and all types of flooring.
Performance Features
High chemical property requirements, resistant to oil stains, acids and alkalis, dustproof, moisture-proof, and static-proof, not corroded by water and chemicals.
2. High mechanical property requirements, strong permeability, forms a protective layer, does not peel or flake off. Resistant to heavy pressure and impact.
3. High safety performance; silicone material is moisture-resistant, flame-retardant, non-toxic, free of solvents and harmful substances, with no adverse effects on humans or air.
4. High aesthetics, low shrinkage, no cracks, available in any color or monochrome, surface is glossy and flatness exceeds 98%, can achieve mirror-like finish.
5. Easy installation, short construction period, does not interfere with normal operations, can be installed at any base.
Construction technique
1. Clean the floor; perform ground cleaning.
2. Apply a primer with a roller, coating the floor surface evenly.
3. The 1st self-leveling application
4. Sanding, for a smooth ground finish.
5. Second self-leveling coat
6. Select the exterior paint color;
7. Normal Operation. After the 7-day test is completed, you may proceed with normal use.
8. Maintenance. Maintenance can be performed after a period of time.

Phone Consultation