Bridge Reinforcement_SupplyPro Co., Ltd._Bridge Reinforcement, Supply Used, Machinery Equipment Network_Gansu Lanhaoxiang Construction Engineering Co., Ltd._Zhongshang 114 Industry Resources Network
全国服务咨询热线
18119407111


Bridge Reinforcement

价      格Negotiable

最小起订0 Piece库存0 Piece

发货时限
3 Days发货
Location
Gansu Lanzhou
有效期至
长期有效
最后更新
2023-04-19 14:07
View Count
35

Business Card

  • Your company's名称Gansu Lanhaoxiang Construction Engineering Co., Ltd.
  • 联 系 人吉路勇 (先生)
  • Your company'sPhone18119407111
  • Mobile号码18119407111
  • Company AddressGansu Province, Lanzhou City, Anning District, Jinniu Street Business Center, Building 15, 3rd Floor, Room 304-19 Area

买家正在看

  • Bridge Reinforcement

    Negotiable

  • Crack Repair

    Negotiable

  • Bridge Cutting

    Negotiable

  • Reinforcement grouting

    Negotiable

Product Details

Static CuttingOn-site construction activities are very common, but they can have an impact on the environment, with pollution being rather evident. Therefore, maintaining the environment during construction is crucial. There are seven main specific cutting requirements.

Equip emergency response personnel and rescue equipment based on emergency plan requirements.

2. Noise control must align with local authorities or nearby residents' needs. Typically, corresponding noise reduction measures should be established. During construction, labor should be concentrated and cutting and installation operations should be carried out during the quietest daytime hours to avoid exceeding noise limits at night.

3. Establish environmental maintenance, sanitation management, and inspection systems at the construction site. Prompt inspections during construction and maintain detailed inspection records.

4. Prior to construction, environmental maintenance and hygiene training for each worker must be conducted, with records kept accordingly.

5. Implement effective vibration reduction methods to seal off the construction site windows, and install soundproof enclosures or hoods at the main sound sources. The walls utilize engineering data with excellent sound-absorbing properties.

6. On-site wastewater treatment utilizes organized drainage. Surrounding the cutting construction, water barriers and ditches are constructed, and wastewater is directed to sedimentation ponds before being discharged into the on-site wastewater well.


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
18119407111