

价 格Negotiable
最小起订0 Piece库存0 Piece
Static CuttingOn-site construction activities are very common, but they can have an impact on the environment, with pollution being rather evident. Therefore, maintaining the environment during construction is crucial. There are seven main specific cutting requirements.
Equip emergency response personnel and rescue equipment based on emergency plan requirements.
2. Noise control must align with local authorities or nearby residents' needs. Typically, corresponding noise reduction measures should be established. During construction, labor should be concentrated and cutting and installation operations should be carried out during the quietest daytime hours to avoid exceeding noise limits at night.
3. Establish environmental maintenance, sanitation management, and inspection systems at the construction site. Prompt inspections during construction and maintain detailed inspection records.
4. Prior to construction, environmental maintenance and hygiene training for each worker must be conducted, with records kept accordingly.
5. Implement effective vibration reduction methods to seal off the construction site windows, and install soundproof enclosures or hoods at the main sound sources. The walls utilize engineering data with excellent sound-absorbing properties.
6. On-site wastewater treatment utilizes organized drainage. Surrounding the cutting construction, water barriers and ditches are constructed, and wastewater is directed to sedimentation ponds before being discharged into the on-site wastewater well.

Phone Consultation