Mining reducer test bench_Product Center Co., Ltd._Mine use reducer test bench, supply, Machinery Equipment Network_Nantong Yuanchen Measurement & Control Equipment Co., Ltd._Zhongshang 114 Industry Resources Network
Nantong Yuanchen Measurement & Control Equipment Co., Ltd.

Complete testing equipment, brake systems, clutches, tensioners, and aligners manufacturing and sales; mechanical parts processing; electromechanical product repair. (Operations subject to license, license required) (As required by laws and regulations, business operations are subject to relevant provisions of the administrative license.)

全国咨询热线
0513- 88901256  13057020018


Mining reducer test bench

价      格Negotiable

最小起订1 Tai库存0 Tai

Location
Jiangsu Nantong
有效期至
长期有效
最后更新
2022-07-19 16:46
View Count
78

Business Card

  • Your company's名称Nantong Yuanchen Measurement & Control Equipment Co., Ltd.
  • 联 系 人许经理 (先生)
  • Your company'sPhone0513- 88901256
  • Mobile号码13057020018
  • Company AddressJiangsu Haian High-tech Industrial Park Accelerator, No. 8

买家正在看

  • Mining reducer test bench

    Negotiable

  • 2000Nm Drilling Rig Test Equipment

    Negotiable

  • Torque Speed Sensor

    Negotiable

  • Hydraulic retarder test bench

    Negotiable

Product Details

Scope

The reducer's performance parameters have been verified to meet design requirements through testing, with stable connections and reliable sealing.

2. Reference Standards

JB/T 9050.3-1999 Cylinder Gear Reducer Load Test Method

3. Sample piece requirements

3.1 General Provisions for Sample Pieces and Their Quantities

Trial pieces are products or prototypes awaiting shipment.

3.2 Material and processing accuracy of the test piece

The main parts should meet the standards for material, heat treatment, and machining, with proper inspection records. If necessary, verify the production inspection records or randomly inspect key items prior to testing.

4. Requirements for the Testing Equipment

Loading test bench, reducer test bench

160kW/55kW Integrated Digital Multi-functional Hub-mounted Planetary Reduction Test Bench

5 Installation and Commissioning

All test equipment (excluding electrical power supply equipment) should be mounted (or integrated) on the same platform, with the requirement that all components be level, centered, and the system operate smoothly. Perform static zeroing first, followed by dynamic zeroing.

6 Test Content and Requirements

6.1 Requirements for Factory Testing of Planetary Reduction Section

6.1.1 Empty Load Test

Tested at the rated speed of 1890 rpm.

b) The reducer operates continuously for 20 minutes.

Requirements: (1) All connectors and fasteners must not loosen; (2) Operation must be smooth with no abnormal noises; (3) Sufficient lubrication with no leakage at any sealing or junction points; (4) Measure and record the shell temperature at the oil sump and bearing (oil temperature should be below 80℃); (5) Record and draw the oil sump temperature rise curve of the reducer under no-load conditions.

6.1.2 Load Test

Test conducted at rated speed of 1890 rpm.

b) Load sequentially at 25% (32kW), 50% (63.5kW), and 75% (95kW) of rated input power, with the reducer operating continuously for 25 minutes at each level.

(1) All connectors and fasteners must not loosen; (2) Operation should be smooth with no abnormal sounds; (3) Sufficient lubrication, with no leakage at all sealing and junction points; (4) Record the speed, torque, and power of the reducer; (5) Record the housing temperature at the oil sump and bearings (oil temperature should be below 90℃); (6) Record and draw the oil sump temperature rise curve of the reducer under the corresponding load.