Wuxi External Wall Insulation Project_SupplyPro Co., Ltd._Wuxi External Wall Insulation Project, Supply, Machinery Equipment Net, Industrial Belts_Wuxi Jianyu Building Energy Conservation Engineering Co., Ltd._Zhongshang 114 Industry Resources Network
Wuxi Jianyu Building Energy Conservation Engineering Co., Ltd.

Wall Repair, Old Wall Renovation, Residential Renovation, Wall Renovation, Wall Repairing, Aging Community Transformation, Roof Leak Repair, Specialized Wall Repair, External Wall Insulation, Internal Wall Insulation, Villa Renovation

全国服务咨询热线
0510-83748883  13921199826


Wuxi External Wall Insulation Project

价      格Negotiable

最小起订0 Piece库存0 Piece

发货时限
3 Days发货
Location
Jiangsu Wuxi
有效期至
长期有效
最后更新
2023-05-09 16:42
View Count
77

Business Card

  • Your company's名称Wuxi Jianyu Building Energy Conservation Engineering Co., Ltd.
  • 联 系 人高文华 (先生)
  • Your company'sPhone0510-83748883
  • Mobile号码13921199826
  • Company Address2 Yannan New Road, Wuxi, Huishan District

买家正在看

  • Wuxi District Wall Renovation Construction Team

    Negotiable

  • Suzhou exterior stone paint application

    Negotiable

  • Suzhou Wall Repair Construction Project

    Negotiable

  • Xishan District renovation construction of old house projects

    Negotiable

Product Details

Exterior Insulation and Finish System (EIFS) Installation Requirements

1. The exterior wall, door, and window construction is complete and has passed the acceptance, with the base surface meeting the requirements of Chapter 5, Section 3 "Concrete Engineering" and Chapter 6, Section 1 "Brickwork Engineering" in the "Standard for Quality Inspection and Appraisal of Construction Quality" (GBT301-88) for multi-story large formwork or for plain walls, respectively.

2. The normal construction temperature for the external wall thermal insulation system is between 5°C and 35°C.

3. Construction sites must ensure road, water, and electricity accessibility.

4. Construction tools and scaffolding should meet the construction requirements (ensuring safety and reliability).

5. Construction site mobile power distribution boxes, potable water pipes should be configured according to the construction requirements.

6. Vertical and horizontal transportation facilities for electrical distribution materials must comply with relevant safety regulations.

7. High-voltage power lines within the construction operation area must maintain a distance in accordance with relevant regulations and be equipped with appropriate protective measures.

8. Remove all obstructions from the wall surfaces to be insulated.

When applying thermal insulation boards, the wind speed should not exceed 5 levels.

10. To ensure construction quality, the construction area should be avoided from prolonged direct sunlight. Note: Construction is not advisable during rain.

11. Construction Tools: Groover, Wallpaper Scissors, Screwdriver, Scissors, Trowel, Brush, Electric Drill, Plastic Mixing Bucket, Hammer Drill, Putty Knife, Wire Holder, 2m Ruler, etc.


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
0510-83748883