PVC pipe fittings are extensively used in the construction industry due to their excellent properties. However, it is crucial to prepare thoroughly before using PVC pipe fittings to avoid any issues later on.
Prior to installing PE pipe fittings, a trench must be dug, and the excavated soil must be placed in a reasonable location, not too close to the trench, maintaining a distance of over two meters. The soil should be promptly transported off-site to avoid affecting future work. During the PE pipe fitting installation, mechanical operation is mandatory; mechanical excavation to the designated trench bottom elevation plus twenty centimeters is sufficient, with the remainder to be excavated by laborers.
To ensure safety, timely completion, and the quality of construction, it is imperative to thoroughly investigate and understand the soil quality and groundwater levels of the area to be constructed before beginning work. This ensures that no unforeseen incidents occur during the construction process!