Safety should be the top priority during the operation of the shuttering machine.
The engineering contractor must install the gate machinery on a level, solid foundation with satisfactory visibility, ensuring the机身 and ground anchors are robust. It is required that the core line of the gate machinery aligns vertically with the centerline of the guide wheel shaft, and the distance between the gate machinery and the wheel shaft should be no less than fifteen meters.
2. Prior to the adjustment operation, inspect the wire rope, separator, brake, locking pawl, drive shaft, and other components to ensure their reliability and safety before operation. The wire rope must be neatly arranged on the drum, with at least three turns to be retained during the operation. During the operation, no one is allowed to climb over the wire rope of the opening and closing machine to prevent any unforeseen incidents.
3. When lifting heavy objects and there is a need for temporary suspension, in addition to using the brake, a ratchet lock should be applied to ensure secure holding. It is strictly prohibited to leave the post without authorization during operation. 4. In the office, employees must follow the signals given by the person in charge. If signals are unclear or may lead to accidents, operations should be suspended until the situation is clarified before resuming work. In case of a sudden power outage during work, the switch should be immediately pulled, and the transported items should be lowered.
www.114global.com © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930