Specializing in generator rentals, including diesel generator leases, silent generator rentals, large generator rentals, emergency generator truck rentals, and various other power equipment rentals.
价 格Negotiable
最小起订0 piece库存0 piece
Generator Rental
Negotiable
Diesel Generator Rental
Negotiable
Diesel generator rental
Negotiable
Cummins generator rented by the c
Negotiable
500KW imported silent generator r
Negotiable
Diesel Generator Rental
Negotiable
Diesel generator rental
Negotiable
Diesel Generator Rental
Negotiable
Diesel Generator Rental
Negotiable
Silent generator rental
Negotiable
What preparations should be made before using an 800kw generator?
Many preparations need to be made before starting up the 800kw generator.
1. The coolant in the radiator of the generator must be adequately filled and operated within the permitted temperature range.
2. Generator sets must have adequate lubricating oil, but not excessive, and operate within the allowable pressure range.
3. The diesel generator frequency remains stable at around 50HZ or 60HZ, with voltage stable around 400V. The three-phase voltage is all 400V, with no significant deviation or phase loss.
4. The three-phase current of the diesel generator set is within the rated range. Estimated load will not exceed the set's power rating.
5. The 800kw generator fuel tank is fully stocked. It can supply at least 8 hours of operating fuel.
6. The generator set must be grounded, and the ground must be level.
7. The starting battery of the generator set must be fully charged.
8. The 800kw generator should be started at no load for about 3 minutes before it can be used under load, once all parameters are normal.

Phone Consultation